Neuhof III



Windpark Neuhof III; 3 x Enercon E101 3 MW

Already in 2007 the necessary land was acquired for the windfarm project Neuhof III. But only the acceptance of sole responsibility for development by ImWind Elements in 2010 brought the breakthrough. Thanks to an excellent cooperation with the Community of Parndorf it was possible to get the windfarm ready to build in only one year. The project consists of 13 turbines Enercon E101 with 3 MW installed capacity, 135m hubhight and 101m rotor-diameter.

The project was built together with the partners WEB (5 turbines) and Ökowind (5 turbines). The ImWind share is 3 turbines.




7024 Neuhof, Austria