Mönchhof



Windpark Mönchhof; 15 x Enercon E101 3 MW

The Windpark Mönchhof is part of the windpark projekt "Mönchhof-Halbturn-Nickelsdorf". Overall, 46 plants, type Enercon E-101, 3 MW were built there. 29 of them are owned by ImWind. The construction of the windpark was a challenge for the more than 500 employees: more than 150 km underground cables were laid and a special exit on the highway has to be organized.




7123 Mönchhof; Austria