Neuhof I & II



Windpark Neuhof; 9 x Vestas V80 2 MW; 2 x Vestas V90 2 MW

The Windpark Neuhof was originally developed in 1997. After ImWind joined the project, the wind park was completely re-planned together with WEB, and it was possible to complete the construction by 2003/2005.




7024 Neuhof, Austria